GENERAL CARPENTRY

1st FIX CARPENTRY

1st  FIX CARPENTRY

The term widely used in the construction industry for all the related woodwork required before a building project is brought forward to the plastering stage, much of which is of a structural nature.

  • Hand cut and trussed roofs.
  • Floor and Ceiling Joists.
  • Floor Boarding.
  • Window boards.
  • Studwork walls.
  • Door linings and Frames.
  • Windows

 

2nd Fix Carpentry

All the related woodwork required to complete a building project once plastering work has been completed.

  • Door Fitting / Hanging.
  • Skirting boards.
  • Dado rails.
  • Handrail and spindles.
  • Pipe boxing.
  • Cupboards and shelves.